Ligen Power: Optimizing Manufacturing Performance
Overcoming inventory delays and production bottlenecks through a data-driven Odoo MRP implementation.
Managing Complex
Electrical Systems Production
Ligen Power faced significant stock management challenges. Manual updates were causing production delays, and the gap between floor operations and warehouse data led to frequent component shortages.
The Solution
Flow Eazy deployed an integrated Odoo MRP and Inventory solution, incorporating barcode scanning and automated Bill of Materials (BoM) processing to unify floor and warehouse data.
The Impact
Achieved a 25% reduction in production cycle time and optimized stock levels, enabling a 15% increase in monthly order fulfillment capacity.
Cycle Time
Reduction in production cycle time through automated BoM processing and routing.
Stock Accuracy
Near-perfect inventory accuracy achieved using integrated barcode scanning systems.
Capacity Increase
Higher order fulfillment capacity without increasing operational overhead.
Ready to Optimize?
Let's streamline your manufacturing operations. Connect with our expert consultants today.